35th Street, north of 12th Avenue, will be resurfaced with asphalt as part of Moline’s 2018 Asphalt Project. This is location #2 of 3.
The project will include an asphalt overlay of the existing pavement. Other work will include pavement patching, curb repairs, sidewalk improvements, driveway repairs, drainage improvements, and other related work.
This project is being funded using 100% tax funds for electric and gas usage.
This location was chosen because the existing concrete pavement is in adequate condition, meaning it doesn’t need reconstructed, however the pavement life could be extended if overlaid with asphalt.
Timeline: Summer / Early Fall 2018
Contractor: Langman Construction
Capital Improvement Project: #1287
Funds:
Contact: Darrel Preston, Construction Manager
(309) 524-2355